| Next release | Jorge Londoño | Sumac.2 Release (First Point Release of Sumac)Scheduled for Monday, Feb 10 No blocking issues have been reported. Three high-priority bugs were identified: Two seem to have easy fixes but need someone to work on them this week. Expected to be resolved before the release cut. Maria Grimaldi and Farhaan Bukhshoffered to help fix pending issues (or at least find someone on their teams to do it) before the release.
Contributors are encouraged to assist in addressing the issues before the deadline. Backports and release notes were briefly discussed; no major concerns were raised.
Sumac.2 Operational ReadinessFarhaan Bukhsh confirmed readiness for the release, with no dependencies or blockers. Issues related to Open edX aspects and Done XBlocks were clarified: Done XBlocks doesn’t require a named release (internal repo). Open edX Aspects PR was accepted, so future releases will include it.
Teak Release Planning (Next Open edX Release)Planning meetings occur every two weeks (next one on Thursday). Teak’s current schedule: Branch cut on April 9, 2025 Final release on June 9, 2025
Dates are flexible and subject to adjustment based on product requirements. Discussion around why Teak has a 2-month testing window (compared to shorter cycles for Sumac and Redwood): Default scheduling assigns 2 months for testing, Previous releases had shorter cycles due to specific product needs and last-minute feature inclusions.
| |