[BD-29] Learning Sequence Experience Improvements

 

Blended Project ID

BD-29

edX Product Lead

@Marco Morales (Deactivated)

edX Technical Primary

@Dave Ormsbee (Deactivated) (@David Joy (Deactivated) as secondary)

Provider

OpenCraft

Provider Lead

@Piotr Surowiec

Calendly Scheduling Link

None used.

Slack Channel

edx-opencraft

Meeting Cadence / Preference

none, relied on async updates after kickoff review.

Action Item Tracking

Use Slack first; can also add action items on project status pages or provider status page

Escalation Path

https://openedx.atlassian.net/wiki/spaces/COMM/pages/1529676506 Escalation path outlined here

Relevant Discovery Documents

NA

Status Update Frequency

biweekly

Target Completion Date

September

~Dev Hours Per Sprint Expected

0 (Done)

Total Hours Used

100% - 11/17

Blended Project Epic (Tracks pull requests)

BLENDED-223

Open Action Items

Status Updates

Time Frame

Updates & Actions Needed

~Hours

Time Frame

Updates & Actions Needed

~Hours

Enter weekly/bi-weekly timeframe for updates (ex. June 15 - June 19)

Insert actions by selecting checkbox icon in page editor

 

Initial status

We scheduled all tickets except:

for the upcoming sprint (June 15 - June 29).

 

June 15 - June 29

Work done this sprint:

Ongoing work from this sprint:

Temporarily blocked:

Removed:

Moved to the next sprint:

Work scheduled for the next sprint:

Work postponed to future sprints:

~213.4h

June 29 - July 13

Work done this sprint:

Ongoing work from this sprint:

Temporarily blocked:

~327.4h

July 13 - July 27

Work completed this sprint:

Ongoing review:

Waiting for review:

Blocked:

Ongoing work from this sprint:

Removed:

Moved to the future sprint:

~429h

450 total is target, updating % above based on this.

July 27 - August 10

Work completed this sprint:

Waiting for review:

Blocked:

  • TNL-7264 (David asked Usman to help with this)

Ongoing work from this sprint:

~485h

August 10 - August 24

Work completed this sprint:

Waiting to be merged:

Waiting for review:

Blocked:

  • TNL-7061 (waiting for the feedback before moving forward)

Ongoing work from this sprint:

~510h

August 24 - September 7

Work completed this sprint:

Waiting to be merged:

  • TNL-7228 (merged, waiting for the ticket’s status update)

Waiting for review:

Ongoing unblocked work:

Archived:

~530h

September 7 - September 21

Work completed this sprint:

Waiting for review:

~550h

(updated to 587.5 hour estimate,up from 450 hours allocated in July. will update percentage based on this new max hour target - Marco)

September 21 - October 5

Work completed this sprint:

  • TNL-7209 (the PR is merged, waiting for the ticket to be marked as Done)

Ongoing review:

~555h

October 5 - October 19

Done:

Waiting for review:

~558h

October 20 - November 2

Waiting for review:

~560h

November 3 - November 16

Done:

565.2h

 

Relevant Jira Stories, Tasks, Bugs

This section links to all the development stories, tasks, and bugs connected to the single (or multiple) epics used to track the work on the Open edX JIRA site.

/

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Relevant Pull Requests linked to Blended Project Epic

This section will link to the edX internal Blended project epic, and contains all Pull Requests related to this Blended Project.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh