Pilot Phase 3
Process Notes
Practical changes:
TBD for Phase 3
Expected Input
All repos included in the Palm Open edX release should be included in this phase. Exceptions:
edx-platform
some of the ecommerce repos?
Expected Outcomes
The monolith is under maintenance
We have a model for shared maintainership
Target Date
Proposed start date 2023-08-01
Pilot Repos – Phase 3 Additions
Status | Repo | Maintainer | Maintainer Org | Maintainer Board | Notes |
---|---|---|---|---|---|
confirmed | Aurora | 2U |
| Nutmeg MFE | |
Pending | Aurora | 2U |
|
| |
confirmed | Aurora | 2U |
|
| |
Pending | No Maintainer |
|
| Needs new maintainer (Harvard & MIT have been proposed as the heaviest users of the service)
| |
confirmed | TNL | 2U |
|
| |
confirmed | TNL | 2U |
|
| |
Pending | FED-BOM | 2U |
| Currently in the “released, but not maintained” category. | |
Pending | ?? | ?? |
|
| |
confirmed | Infinity | 2U |
| This is a Ruby app which is the back end for frontent-app-discussions (which is under maintainership). We don’t have a plan for meeting some of the maintainership reqs for Ruby apps but it seems like this should be officially maintained if the frontend is? | |
Pending | @Jonh Venté (discussed here) | EduNext |
|
| |
NEWLY CREATED | Aurora | 2U |
| This was moved from Phase 2 and is a relatively recently created repo. | |
Pending | edx-platform | Shared | Shared |
| @Jeremy Bowman (Deactivated) is leading this shared work. We are adding to phase 3 based on expected timeline for rolling our platform maintance. |
Pending | Aurora | 2U |
| included in Palm as an experimental feature, next steps uncertain. @Adolfo Brandes This was originally in phase 4, but given that it’s in Palm I wanted to revisit that conversation. | |
Pending | RaccoonGang | RaccoonGang |
| @Glib Glugovskiy will be the point of contact and I’ll nominate him for additional scope. | |
confirmed | RaccoonGang | RaccoonGang |
| @Volodymyr Chekyrta we’d like to add the new mobile applications to phase 3 of the maintainership roll out. | |
confirmed | RaccoonGang | RaccoonGang |
| @Volodymyr Chekyrta we’d like to add the new mobile applications to phase 3 of the maintainership roll out. | |
confirmed | Axim | Axim |
| @Brian Mesick and @Feanil Patel we can coordinate what’s required with the Aximprovements Team. | |
confirmed | Axim | Axim |
| @Brian Mesick and @Feanil Patel we can coordinate what’s required with the Aximprovements Team. | |
confirmed | Axim | Axim |
| @Brian Mesick and @Feanil Patel we can coordinate what’s required with the Aximprovements Team. | |
Pending |
|
|
| @Zia Fazal should the Edly be the named maintainer of this repo? | |
confirmed | Axim | Axim |
| @Brian Mesick and @Feanil Patel we can coordinate what’s required with the Aximprovements Team. | |
confirmed | Axim | Axim |
| @Brian Mesick and @Feanil Patel we can coordinate what’s required with the Aximprovements Team. | |
confirmed | Axim | Axim |
|
| |
confirmed | OpenCraft- @Piotr Surowiec | OpenCraft |
|
| |
confirmed | OpenCraft- @Piotr Surowiec | OpenCraft |
|
|