2024-08-26 BTR Meeting Minutes

2024-08-26 BTR Meeting Minutes

:calendar_spiral: Date

Aug 26, 2024

:busts_in_silhouette: Participants

  • Adolfo Brandes

  • Jorge Londoño

  • Chelsea Rathbun

  • Peter Pinch

  • Maria Grimaldi

  • Brayan Cerón

🎥 Recording & Chat

:speaking_head: Discussion topics

Time

Item

Presenter

Notes

Action Items :white_check_mark:

Time

Item

Presenter

Notes

Action Items :white_check_mark:

 

Newsfeed

Jorge Londoño

 

 

 

Redwood retrospective:

Jorge Londoño

 

  • Jorge Londoño will create GH issues for the retro action items.

 

Thinking ahead:

  • Sumac

    • :scissors: sumac.master ~ 2024-10-09 (TO BE CONFIRMED)

    • :one: sumac.1 ~ 2024-12-09 (TO BE CONFIRMED)

    • Alignment with the https://docs.google.com/spreadsheets/d/1tWgp9LXNg4sfWYd_0ghNl6qfIZZ9851MtGBXPeSgzFs and monthly follow-ups led by the Product WG Community Release Planning

    • Current BTR roles assignment (TO BE CONFIRMED)

      • Group Chair: Jorge Londoño

      • Release Manager: Maksim Sokolskiy

      • Release Testing Coordinator: Peter Pinch

      • Quality Assurance Manager: Vacant

      • Release Documentation Expert: Chris Patti

      • Bug Triagers: Maria Grimaldi Donato Bracuto (Unlicensed)

      • Security Patcher: Mariagabriela Giorgianni (Unlicensed)

Jorge Londoño

  • Cutoff and release dates

    • We’re considering two options: either 6 weeks before release, on Oct 23, or 7 weeks before release, on Oct 16.  The 7-week option is there to account for the week-or-so that it took for the release testing sandbox to come up for Redwood. If Edly can guarantee the testing sandbox can be ready a day before the cutoff, we could aim to a 6-week testing and debugging period.

  • Vacant BTR positions

    • We agreed on guaranteeing a shadowing period for offering some psychological safety to the new members and ensuring a proper knowledge transfer.

  • Jorge Londoño will post a call to fill the open positions in the community channels.

  • Jorge Londoño will document the proposed workflow between the BTR WG and the Maintainers WG for Sumac.

  • Jorge Londoño will bring the Sumac release milestones dates proposal to the next Release Planning session.

  • Adolfo Brandes will ask Edly if it is possible to get Tutor and its plugins already working on master on the day before the cutoff

 

 

 

 

 

 

 

 

 

 

 

:arrow_heading_up: Decisions

  •