Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

\uD83D\uDDE3 Discussion topics

Time

Item

Presenter

Notes

Standard Page Layouts

Epic: PAR-396 - Getting issue details... STATUS

Add to Paragon Figma library: PAR-404 - Getting issue details... STATUS

Develop the component: PAR-403 - Getting issue details... STATUS




Tech Lead’s capacity between Paragon and Enterprise.

  • My primary focus is on Enterprise work and supporting the Enterprise Engineering teams.

  • Not enough time to create a more fleshed out technical roadmap for Paragon; most of the existing technical tasks in the backlog have been shipped.

    • Without a more constant stream of work coming from design → engineering, I don’t currently have the bandwidth to brainstorm and plan impactful technical contributions to populate the technical backlog for when there isn’t as much work ready for engineering.

  • Not enough time to think strategically about Paragon and do things like the Engineering 1:1s.

Marco

Product Pulse / Open edX update re: recent Paragon work

  • considering when this would make sense to author / pull together makes sense, don't have to commit to any specific timeline

✅ Action items

  •  

⤴ Decisions

  • No labels