10+ minutes
| Design tokens rollout plan
| Brian Smith
| Tentative plan: Merge tokens support to v23 Paragon. Merge frontend-build and frontend-platform PRs (non-breaking releases). From an operator perspective, we do not want to have some MFEs consume tokens while others not, so we want to try to coordinate these releases. MFEs can upgrade to v23 in *-design-tokens branches, without impacting master immediately. DEPR? Timeline: Pre-Sumac is ambitious. Instead, we want to get tokens compatible branches ready pre-Sumac but merged/released post-Sumac. If operators want to run tokens sooner than a post-Sumac release, operators could deploy MFEs from the *-design-tokens feature branches as they’re ready.
Q: What is the plan for maintenance of design tokens post roll-out?
|