Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Page Properties

Blended Project ID

BD-35

Blended Project Epic (Tracks Pull Requests)

https://openedx.atlassian.net/browse/BLENDED-709?atlOrigin=eyJpIjoiYzMzMmEyZWMxNWJkNGM1NDlkYjI3Y2Y1OWJhYTJlNjMiLCJwIjoiaiJ9

Project Hours and Status

https://docs.google.com/spreadsheets/d/1qe6t3NSxSroXCmFxj1FJqf4psM5nA5OpGrrLPJfkmy4/edit#gid=1283406689

edX Product Lead

Marco Morales (Deactivated)

edX Technical Primary

Adam Butterworth (Deactivated)

Provider

eduNEXT

Provider Lead

Calendly Scheduling Link (where applicable)

Slack Channel

Meeting Cadence / Preference

Method of Action Item Tracking

Escalation Path

Relevant Discovery Documents

Status Updates

Link to status tracking sheet

Target Completion Date

Paused (Aug 2021)

SOW Completion Date

Open Action Items

Task report
pages3134619682
isMissingRequiredParameterstrue

Linked Project Milestones

This section will link to all the milestones / epics to this blended project the Open edX JIRA site.

Jira Legacy
serverSystem JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryissue in linkedIssues(BLENDED-709)
serverId13fd1930-5608-3aac-a5dd-21b934d3a4b4

Relevant Pull Requests linked to Blended Project Epic

This section will link to the edX internal Blended project epic, and contains all Pull Requests related to this Blended Project.

Jira Legacy
serverSystem JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuery"Epic Link" = BLENDED-709
serverId13fd1930-5608-3aac-a5dd-21b934d3a4b4

Meeting Notes

Child pages (Children Display)
page[BD-35] Accelerated Paragon Component Development