Paragon Status

Summary of work Dec 1, 2020 - Feb 1, 2021

DELivered 3 new components, 1 update, a new svg icon library.

  • IN DEVELOPMENT 1 component brand update

  • DESIGN COMPLETE, ENG PENDING 11 component updates and 5 new components (14 likely as part of BD-35)

  • IN DESIGN 6 new components and 3 updates

  • NEEDS DESIGN 1 new component


Roadmap

The four phase plan presented in the fall has been reworked.

The roadmap has dropped Phase 3 and 4 of that plan. Moving forward, components and other efforts will be reflected in their own epics. Today, these new epics are currently open ended. Adam B. will work to better clarify due dates and timelines in these efforts throughout Q3.

We will trial blended development for Paragon priorities

The original plan requested a dedicated frontend engineer for several weeks to implement new features. Instead we’ll explore blended development. eduNext via BD-35 will complete https://openedx.atlassian.net/browse/PAR-36 as our first trial

Note: Trialing of blended development will not affect the work that some engineering squads are currently undertaking to implement new components needed for their squad work. We’ll work to better understand the right balance after BD-35 is completed.

 

https://openedx.atlassian.net/jira/software/projects/PAR/boards/654/roadmap

Projects on the horizon

  • Adoption of CSS Variables or CSS in JS styling solutions

  • Dashboard for monitoring component usage in edX applications

  • Internationalization for Paragon


Status Details

Delivered and ready for use

Name

Description

Name

Description

https://openedx.atlassian.net/wiki/spaces/BPL/pages/1948483691 (alpha)

Display large lists of data with filters, selection, and bulk actions.

https://openedx.atlassian.net/wiki/spaces/BPL/pages/2103083206

A small graphic to represent a user

A button that contains the user’s Avatar.

Icon Component Update

Add svg rendering capability

SVG Icon Library

72 new svg icons are available and compatible with Paragon’s Icon component. https://paragon-edx.netlify.app/foundations/icons/

Implementation planned or in progress

Name

Eng Resourcing

Name

Eng Resourcing

Brand update

Adam Stankiewicz is driving in spare time. Check in to determine if he truly has bandwidth Feb 5, 2021

Design complete and needs implementation

Name

Eng Resourcing

Name

Eng Resourcing

(brand)

Coordinating with eduNext on doing this work as part of BD-35.

(brand)

(brand)

(brand)

(brand)

(still in design) (brand)

(brand)

(brand)

Tabs (still in design) (brand)

Toast (still in design) (brand)

(brand)

@Adam Butterworth (Deactivated) to find resources

@Adam Butterworth (Deactivated) to find resources

Design planned or in progress

Name

Design Resourcing

Name

Design Resourcing

Gabe (no ticket)




Gabe

Bronwyn

Toast

Gabe

Adam

Adam

Multiselect

Jon

Error content block components

Bronwyn

Spot illustration library

Bronwyn

Empty or Welcome content blocks

Bronwyn

DataTable follow ups

Adam B.

Proposal accepted needs design

 

 

 

 

@Adam Butterworth (Deactivated) to ticket and prioritize design

Pagination

@Adam Butterworth (Deactivated) to assign

Upcoming

  • Engineering Paragon survey results