Summary of work -
DELIVERED 3 new components, 1 component update, a new svg icon library, and the edx.org brand theme.
IN DEVELOPMENT 1 component brand update
DESIGN COMPLETE, ENG PENDING 11 component updates and 5 new components (14 likely as part of BD-35)
IN DESIGN 6 new components and 3 updates
NEEDS DESIGN 1 new component
Roadmap
The four phase plan presented in the fall has been reworked.
The roadmap has dropped Phase 3 and 4 of that plan. Moving forward, components and other efforts will be reflected in their own epics. Today, these new epics are currently open ended. Adam B. will work to better clarify due dates and timelines in these efforts throughout Q3.
We will trial blended development for Paragon priorities
The original plan requested a dedicated frontend engineer for several weeks to implement new features. Instead we’ll explore blended development. eduNext via BD-35 will complete https://openedx.atlassian.net/browse/PAR-36 as our first trial
Note: Trialing of blended development will not affect the work that some engineering squads are currently undertaking to implement new components needed for their squad work. We’ll work to better understand the right balance after BD-35 is completed.
Projects on the horizon
Adoption of CSS Variables or CSS in JS styling solutions
Dashboard for monitoring component usage in edX applications
Internationalization for Paragon
Status Details
Delivered and ready for use
Name | Description |
---|---|
Data Table (alpha) | Display large lists of data with filters, selection, and bulk actions. |
A small graphic to represent a user | |
A button that contains the user’s Avatar. | |
Add svg rendering capability | |
SVG Icon Library | 72 new svg icons are available and compatible with Paragon’s Icon component. https://paragon-edx.netlify.app/foundations/icons/ |
Implementation planned or in progress
Name | Eng Resourcing |
---|---|
Card Brand update | Adam Stankiewicz is driving in spare time. Check in to determine if he truly has bandwidth https://openedx.atlassian.net/browse/PAR-307 |
Design complete and needs implementation
Name | Eng Resourcing |
---|---|
Alert (brand) | Coordinating with eduNext on doing this work as part of BD-35. https://openedx.atlassian.net/browse/PAR-36 |
Badge (brand) | |
Breadcrumbs (brand) | |
Collapsible (brand) | |
Dropdown (brand) | |
Progress Bar (still in design) (brand) | |
Popover (brand) | |
Search Field (brand) | |
Tabs (still in design) (brand) | |
Toast (still in design) (brand) | |
Tooltip (brand) | |
| |
|
Design planned or in progress
Name | Design Resourcing |
---|---|
Gabe (no ticket) | |
Modal (Updates) | |
Toast | |
Multiselect | |
Error content block components | |
Spot illustration library | |
Empty or Welcome content blocks Empty State Cards | |
DataTable follow ups |
Proposal accepted needs design
| |
Pagination | https://openedx.atlassian.net/browse/PAR-323
|
Upcoming
Engineering Paragon survey results