Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

Summary of work -

  • DELIVERED 3 new components, 1 component update, a new svg icon library, and the edx.org brand theme.

  • IN DEVELOPMENT 1 component brand update

  • DESIGN COMPLETE, ENG PENDING 11 component updates and 5 new components (14 likely as part of BD-35)

  • IN DESIGN 6 new components and 3 updates

  • NEEDS DESIGN 1 new component


Roadmap

The four phase plan presented in the fall has been reworked.

The roadmap has dropped Phase 3 and 4 of that plan. Moving forward, components and other efforts will be reflected in their own epics. Today, these new epics are currently open ended. Adam B. will work to better clarify due dates and timelines in these efforts throughout Q3.

We will trial blended development for Paragon priorities

The original plan requested a dedicated frontend engineer for several weeks to implement new features. Instead we’ll explore blended development. eduNext via BD-35 will complete https://openedx.atlassian.net/browse/PAR-36 as our first trial

Note: Trialing of blended development will not affect the work that some engineering squads are currently undertaking to implement new components needed for their squad work. We’ll work to better understand the right balance after BD-35 is completed.

https://openedx.atlassian.net/jira/software/projects/PAR/boards/654/roadmap

Projects on the horizon

  • Adoption of CSS Variables or CSS in JS styling solutions

  • Dashboard for monitoring component usage in edX applications

  • Internationalization for Paragon


Status Details

Delivered and ready for use

Name

Description

Data Table (alpha)

Display large lists of data with filters, selection, and bulk actions.

Avatar

A small graphic to represent a user

AvatarButton

A button that contains the user’s Avatar.

Icon Component Update

Add svg rendering capability

SVG Icon Library
Iconography

72 new svg icons are available and compatible with Paragon’s Icon component. https://paragon-edx.netlify.app/foundations/icons/

Implementation planned or in progress

Name

Eng Resourcing

Card Brand update

Adam Stankiewicz is driving in spare time. Check in to determine if he truly has bandwidth https://openedx.atlassian.net/browse/PAR-307

Design complete and needs implementation

Name

Eng Resourcing

Alert (brand)

Coordinating with eduNext on doing this work as part of BD-35. https://openedx.atlassian.net/browse/PAR-36

Badge (brand)

Breadcrumbs (brand)

Collapsible (brand)

Dropdown (brand)

Form Field: Checkbox

Form Field: Radio Button

Form Field: Text Input

Progress Bar (still in design) (brand)

Popover (brand)

Search Field (brand)

Tabs (still in design) (brand)

Toast (still in design) (brand)

Tooltip (brand)

Menu Item

Page Banner

Design planned or in progress

Proposal accepted needs design

Upcoming

  • Engineering Paragon survey results

  • No labels