| Thinking ahead: Sumac sumac.master ~ 2024-10-09 (TO BE CONFIRMED) sumac.1 ~ 2024-12-09 (TO BE CONFIRMED) Alignment with the and monthly follow-ups led by the Product WG Current BTR roles assignment (TO BE CONFIRMED) Group Chair: @Jorge Londoño Release Manager: @Maksim Sokolskiy Release Testing Coordinator: @Peter Pinch Quality Assurance Manager: Vacant Release Documentation Expert: @Chris Patti Bug Triagers: @Maria Grimaldi @Donato Bracuto Security Patcher: @Maga Jaimes
| @Jorge Londoño | Cutoff and release dates We’re considering two options: either 6 weeks before release, on Oct 23, or 7 weeks before release, on Oct 16. The 7-week option is there to account for the week-or-so that it took for the release testing sandbox to come up for Redwood. If Edly can guarantee the testing sandbox can be ready a day before the cutoff, we could aim to a 6-week testing and debugging period.
Vacant BTR positions
| @Jorge Londoño will post a call to fill the open positions in the community channels. @Jorge Londoño will document the proposed workflow between the BTR WG and the Maintainers WG for Sumac. @Jorge Londoño will bring the Sumac release milestones dates proposal to the next Release Planning session. @Adolfo Brandes will ask Edly if it is possible to get Tutor and its plugins already working on master on the day before the cutoff
|